Project: phowe   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Feb 23, 2024     Rudder Return Kit - (4 hours)       Category: Interior Finish
We ended up drilling out the rivets and moving the back pully. and creating a strap over the back so that we didn't have to drill new holes through the skin. We drilled new holes through the floorboards and riveted those as well. We cut the plastic rudder cable close out so that the cables could pass through. We then measured, cut, and riveted the rudder cable mounts to the floorboards. We matched drilled the tunnel to the mounting rails and then installed the Timmermans.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.